Client:
BSEL Tech Park Premises Co-operative Society Ltd.
Location:
Sector 30, Vashi, Navi Mumbai
Project Type:
Repair & Rehabilitation Project β PMC (Project Management Consultancy)
Building Details
Structure: Commercial IT Tower
Configuration: 3 Basements + Ground + 14 Upper Floors
Usage: Corporate & IT Offices
Built-up Area: Approx. 2,50,000 sq.ft.
Year of Construction: Circa 2005
Background & Objective
The management of BSEL Tech Park observed recurring leakage, corrosion, and plumbing failures within service ducts and terrace zones.
Frequent complaints of foul odor, water seepage, and damaged finishes were affecting tenantsβ operations and maintenance costs.
To address these challenges in a structured and transparent manner, Valorem Engineering Pvt. Ltd. was appointed as the Project Management Consultant (PMC) to handle the entire repair process from assessment to execution monitoring.
The project required technical expertise, cross-coordination between multiple contractors, and strict quality control, given the operational nature of the building with ongoing office activities.
Scope of PMC Work
Preliminary Structural & Plumbing Audit
β Inspection of 14 service ducts (vertical risers)
β Assessment of RCC members, plumbing joints, and drainage systems
β Identification of unsafe, deteriorated, or corroded sections
Planning & Tendering
β Preparation of Repair Estimate, BOQ, and Tender Documents
β Technical vetting of contractors and comparative analysis
β Assistance in contractor selection through transparent process
Execution Supervision & Quality Control
β Daily on-site supervision and progress tracking
β Verification of quantities and workmanship standards
β Approval of material brands and mix designs (plumbing + civil repair)
β Testing and inspection through NDT and visual verification
Coordination & Documentation
β Periodic review meetings with Society Committee and Contractors
β Monthly progress reports and photo documentation
β Coordination between Structural, Plumbing, and Waterproofing teams
Safety & Compliance
β Ensured proper scaffolding, safety nets, and restricted working zones
β Compliance with NMMC and Fire Department norms for repair works
Challenges Faced
β Restricted access due to active corporate offices operating during daytime
β Complex vertical duct system with existing 4β soil, 3β waste, and 4β rainwater lines running continuously from terrace to basement
β Need for phased working and noise control to avoid operational disruption
β Coordination of multiple vendors under a single PMC umbrella
Valorem Engineeringβs Approach
Valorem adopted a data-driven and methodical repair management strategy:
β Used drone-based faΓ§ade survey for external condition mapping
β Carried out duct-by-duct documentation with measurement sheets and photographs
β Recommended selective replacement instead of full plumbing overhaul, resulting in significant cost optimization
β Introduced quality checkpoints and material inspection protocols for epoxy coating, clamps, and waterproofing
Results & Benefits
β
Completed repair planning and execution monitoring for 14 vertical ducts
β
Ensured seamless functioning of corporate offices during the work period
β
Achieved cost savings of nearly 25% by optimizing replacement scope
β
Enhanced plumbing performance, leakage control, and structural durability
β
Provided end-to-end technical documentation and progress reports to the Society for future reference
Project Duration:
3 Months (Audit, Tendering, and Execution Monitoring)
Engineerβs Note β Mr. Sagar Prakash Shinde
Founder & Principal Consulting Engineer, Valorem Engineering Pvt. Ltd.
βAt BSEL Tech Park, our goal was to ensure technical precision and financial discipline without disturbing day-to-day operations.
Through systematic planning, quality control, and on-site supervision, we helped the society extend the life of its infrastructure and regain confidence in its maintenance systems.β
Key Highlights
Scope: Structural Repair + Plumbing Rehabilitation
No. of Ducts: 14 Nos.
Total Plumbing Lines Handled:
4β Soil Pipe β 210 Rft per duct
3β Waste Pipe β 350 Rft per duct
4β Rainwater Pipe β 140 Rft per duct
Supervision: Daily PMC Inspection + Weekly Client Review